IARU Amateur Satellite Frequency Coordination |
MAESAT | Updated: 11 Apr 2017 | Responsible Operator | Abdullah Sheikh 9V1SG | |
Supporting Organisation | Nanyang Technological University | |||
Contact Person | abdullah@ntu.edu.sg.nospam | |||
Headline Details: The main mission of the project is to develop and orbit a 1U CubeSat in Low Earth Orbit (LEO) for technology demonstration. The mission aims to verify the structural integrity of the proposed Space Station developed using additive manufacturing. ** A downlink on 437.475 MHz has been coordinated** The Space Station will primarily transmit beacon signals to the NTU ground station. The mission is planned for a period of about 6 months after deployment from the ISS. Proposing a CW beacon and 9k6 GMSK telemetry downlink on UHF. Planning a deployment from the ISS in 2018 after being upmassed from Tanegashima Space Center. | ||||
Application Date: | 04 Apr 2017 | Freq coordination completed on | 11 Apr 2017 |
The IARU Amateur Satellite Frequency Coordination Status pages are hosted
by AMSAT-UK as a service to the world wide Amateur Satellite Community
|