IARU Amateur Satellite Frequency Coordination

 
Back to List of Sats NOT yet formally submitted

NUS QB50 Updated: 11 May 2015   Responsible Operator Mouthaan Koenraad 9V1LW
Supporting Organisation QB50 & National University of Singapore  
Contact Person k.mouthaan@nus.edu.sg.nospam  
Headline Details: A 2U CubeSat to conduct scientific experiments in space. With the data collected from the payloads, the satellite will be communicated with the ground station and transfers data within least possible time. Phase One After deployment from Cyclone space shutter’s POD, NUS QB50 will first activate its Electrical Power System. After which, the antenna will activate its deployment within 30 seconds. Then NUS QB50 will detumble within 48 hours. Phase Two (Mission) The mission will include downlink & uplink of data, conduction of FIPEX experiment and conduction of SPEQS experiment. For the duration of downlink & uplink of data, it will take maximum duration of 214 seconds. The time reserved for conduction of FIPEX experiment is maximum of 120 minutes a day (4 times of 30 minutes per experiment). For the SPEQS experiment, it will run at the maximum of 20 minutes. Proposing 9k6 GMSK downlink.**** This project has been cancelled**
Application Date: 05 Nov 2013   Freq coordination completed on

The IARU Amateur Satellite Frequency Coordination Status pages are hosted by AMSAT-UK as a service to the world wide Amateur Satellite Community